JHMC has a professional
installation team, forming by hundreds of technicians. The team has rich experience to install all kinds of products, i.e. hydraulic steel structures, radial gates, bonnet gates, flap gates, bulkhead gates, trash rack, penstock, electrical & mechanical equipments, gantry crane, overhead crane, cable crane, hydraulic hoist, electrical monitoring and controlling systems, etc. Every year this team mainly complete the installation of hundreds and thousands tons. The workmanship and installation result of Miter Gate of Three Gorges HPP Ship Lock was appraised as the third prize by the Sichuan Province Scientific and Technology Society. In Pakistan, JHMC installed the 2 x 6000KN Hydraulic Hoist and the biggest bonnet gate in Neelum & Jeelum Project, and in Jinnah Barrage, 128 sets of various
types of gate were installed in time...
Stoplog Installation underwater 110m of Tarbela 4th Extension HPP in Pakistan
Stoplog Installation underwater 110m of Tarbela 4th Extension HPP in Pakistan
Miter Gate Installation of Three Gorges HPP in China
Gates Installation of Main Dam of Jinnah Barrage in Pakistan
Installation in M&P HPP in Pakistann
Bifurcator Installation in China
Overhead Crane Installation of Three Gorges HPP in China
Draft Tube Installation of M&P HPP in Pakistan
Gates Installation of Main Dam of Jinnah Barrage in Pakistan
|